Skip to content
VEYRA Global Technologies — Buy on merit. Not relationships.Veyra

Marketplace

From a cordless drill to a 125-tonne excavator — and cranes of any size.

One request. Comparable hire quotes. Clear costs. VEYRA connects your business with onboarded hire companies operating under our Master Framework Agreement. Compare equipment, availability and pricing against the same requirements, with charges disclosed upfront.

Spend less time chasing suppliers and more time with your clients. Hire listings and availability shown anywhere on VEYRA are provided by onboarded hire companies; VEYRA does not invent supplier stock, pricing, availability or agreement acceptance.

Equipment range

Everything from site tools to major lifting equipment.

  • Power tools and small equipment
  • Access equipment, scissor lifts and boom lifts
  • Excavators, loaders, skid steers and earthmoving equipment
  • Compaction, concreting and roadworking equipment
  • Forklifts, telehandlers and material-handling equipment
  • Mobile cranes, crawler cranes and other crane types
  • Generators, compressors, pumps and lighting towers
  • Attachments and specialist equipment

Filter by equipment type, capacity, specifications, location, hire dates, duration, quantity, delivery or collection, and wet or dry hire. Wet hire includes an operator. Dry hire is equipment supplied without one.

How it works

Five steps, one record of truth.

  1. 01

    One structured hire request

    Capture equipment, capacity, site, dates, operating hours, wet or dry hire, attachments, delivery or collection, operator requirements and any lift planning. Every eligible hire company quotes against the same request.

  2. 02

    Agreement verified first

    Only onboarded hire companies with a current, verified VEYRA Master Framework Agreement acceptance can quote or accept bookings. Supplier-specific conditions do not silently override the framework.

  3. 03

    Comparable, itemised pricing

    Each quote itemises hire, operator, delivery, attachments, insurance, fuel, cleaning, minimum hours, overtime, weekend rates and bonds. Quotes with missing mandatory fields or undisclosed compulsory charges are rejected.

  4. 04

    Blind comparison and booking

    Compare suppliers by bidder number on total cost, confirmed availability, suitability, delivery timing, compliance and verified performance. Approve under your existing delegation limits, then confirm the booking.

  5. 05

    Extensions, off-hire and reconciliation

    Variations follow the framework's variation process with recorded customer approval. Off-hire and collection are tracked, and invoices reconcile against the agreed booking.

Transparent pricing

Every hire quote shows the complete price for the stated scope.

  • Base hire rate for the stated duration
  • Operator charges, where wet hire applies
  • Delivery, collection and mobilisation
  • Attachments and accessories
  • Insurance or damage-waiver charges, where applicable
  • Fuel arrangements and refuelling rates
  • Cleaning requirements and applicable charges
  • Minimum hours, overtime and excess-use rates
  • Weekend and public-holiday rates
  • Any other mandatory fees
  • GST and the total payable

Refundable bonds appear separately from hire costs. Cancellation, extension, breakdown, off-hire, damage and late-return conditions are disclosed before booking. Where a cost depends on usage, the calculation method, rate and assumptions are shown upfront — estimated totals are not labelled as fixed prices.

Suppliers

Onboarded under one Master Framework Agreement.

Hire companies complete VEYRA's existing onboarding, then verify execution of the applicable Master Framework Agreement with the agreement version, authorised signatory, acceptance date and supporting evidence recorded. Without a current, verified acceptance a supplier cannot submit hire quotes or accept bookings. VEYRA uses its approved agreement wording and does not generate or invent contractual terms.

Dry Hire Master Framework Agreement — VEYRA-DH-MFA v0.3 (4 October 2026)

Draft for commercial and Australian legal review. Not yet for execution.

Download the draft agreement (Word, 67 KB)

Ready to run your first hire request?

Buyers can draft a hire request from the Buyer portal. Hire companies can start onboarding and record their framework agreement acceptance from the Supplier portal.